[arin-ppml] STLS 8.3

Kevin Blumberg kevinb at thewire.ca
Thu Mar 24 21:49:46 EDT 2011


I have two questions in regards to 8.3.

1) Is the STLS require a 12 month justification or 3 month or ???.

2) If Company A has a /18 netblock and wishes to use the STLS to transfer
a /19 to Company B and a /19 to Company C is that prohibited in the STLS?

Thanks,


Kevin Blumberg
T 416.214.9473 x31
F 416.862.9473
kevinb at thewire.ca









More information about the ARIN-PPML mailing list