[arin-ppml] LAST CALL - Recommended Draft Policy ARIN-2025-7: Make Policy in 6.5.8.2 Match the Examples

ARIN info at arin.net
Tue Nov 24 11:28:26 EST 2026


In accordance with the Policy Development Process (PDP), the Advisory Council met on 19 November 2026.

The AC has sent the following Recommended Draft Policy to Last Call for a period of 30 days.

* Recommended Draft Policy ARIN-2025-7: Make Policy in 6.5.8.2 Match the Examples

The AC has provided the following comments:

“This policy was presented at ARIN 58, and was found to be impartial and technically sound, and the policy received strong community support. Community feedback also noted that the phrases “are eligible to receive an initial” and “will receive” could be read to mean that organizations are required to accept a larger allocation. That was not the intent of the policy.

To address this feedback, the Advisory Council made the following minor changes:

from “are eligible to receive an initial” to “qualify for”
from “will receive” to “qualify for”

The revised wording makes clear that organizations are eligible for larger allocations under 6.5.8.2 but are not required to take them.

These are minor changes only. They do not alter qualification thresholds or ARIN practice.

Because the text was revised after ARIN 58, the Advisory Council has set an extended Last Call period of 30 days so the community has more time to review the updated language.”

Feedback is encouraged during the Last Call period. All comments should be provided to the Public Policy Mailing List. Last Call will expire on 24 December 2026.

The Recommended Draft Policy text is below and available at:

https://www.arin.net/participate/policy/drafts/2025_7/ 

The ARIN Policy Development Process is available at:

https://www.arin.net/participate/policy/pdp/

Draft Policies and Proposals under discussion can be found at: 

https://www.arin.net/participate/policy/drafts/

Regards,

Eddie Diego
Policy Analyst
American Registry for Internet Numbers (ARIN)


Recommended Draft Policy ARIN-2025-7: Make Policy in 6.5.8.2 Match the Examples

Current Text (24 November 2026)

AC Assessment of Conformance with the Principles of Internet Number Resource Policy

Recommended Draft Policy ARIN-2025-7 conforms to the principles of the ARIN Policy Development Process. If adopted, this policy fixes a math loophole in NRPM Section 6.5.8.2 to clarify that a single-site organization receives a /48 IPv6 allocation. To align with current registry procedures, it also updates the terminology throughout the section from “assignment” to “allocation.” These clarifications match ARIN’s actual current practices, introduce no operational changes, and have received strong community support both on the PPML and at recent ARIN meetings. We have found this policy to be fair, impartial, and technically sound. Additionally, we have had no concerns expressed by the community for this policy.

Problem Statement

6.5.8.2 states “An organization qualifies for an assignment on the next larger nibble boundary when their sites exceed 75% of the /48s available in a prefix.“and then follows with “For example: More than 1 but less than or equal to 12 sites justified, receives a /44 assignment;“implying that a single site should only receive a /48. However, 1 /48 exceeds 75% of the /48s available in a /48 (1), so per the rule an organization with a single site should receive a /44, which differs from the example.

Policy Statement

Current Text:

6.5.8.2. Initial Assignment Size

Organizations that meet at least one of the initial assignment criteria above are eligible to receive an initial assignment of /48. Requests for larger initial assignments, reasonably justified with supporting documentation, will be evaluated based on the number of sites in an organization’s network and the number of subnets needed to support any extra-large sites defined below.

The initial assignment size will be determined by the number of sites justified below. An organization qualifies for an assignment on the next larger nibble boundary when their sites exceed 75% of the /48s available in a prefix. For example:

More than 1 but less than or equal to 12 sites justified, receives a /44 assignment;

More than 12 but less than or equal to 192 sites justified, receives a /40 assignment;

More than 192 but less than or equal to 3,072 sites justified, receives a /36 assignment;

More than 3,072 but less than or equal to 49,152 sites justified, receives a /32 assignment; etc…

Proposed Text:

6.5.8.2. Initial Allocation Size

Organizations that meet at least one of the initial allocation criteria above qualify for an initial allocation of /48. Larger initial allocation sizes will be determined by the number of sites justified below; an organization will qualify for an allocation on the next larger nibble boundary when their sites exceed 75% of the /48s available in a prefix. For example:​

2 to 12 sites justified qualify for a /44 allocation;​

13 to 192 sites justified qualify for a /40 allocation;​

193 to 3,072 sites justified qualify for a /36 allocation;​

3,073 to 49,152 sites justified qualify for a /32 allocation, etc.​

Comments

Following feedback at ARIN 58, “are eligible to receive an initial” and “will receive” were replaced with “qualify for” to clarify that organizations are eligible for, but not required to take, larger allocations.